Add to Favorites
Share

Spray Welding Nickel Alloy Powder

  • Description
Product Detail

    Spray Welding Nickel Alloy Powder

    Alloy

    HRC

    Chemical Composition

    Particle Size Distribution

    Typical Application

    C

    Cr

    Si

    W

    Fe

    Mo

    Ni

    Co

    Mn

    B

    Others

    Ni60B

    60

    0.6

    17.1

    3.1


    25


    Bal


    0.46

    4


    150/300?53/20µm

    Pistons, extrusion molds, pump blades, extrusion screws

    Ni60AACuMo

    58

    0.5

    15.5

    4


    3.00Max

    2.5

    Bal



    3.5

    Cu:2.5

    150/300?53/20µm

    Pistons, extrusion molds, pump blades, extrusion screws

    Ni60AACuMo1

    60

    0.7

    15

    4


    5.00Max

    2.5

    Bal



    3.2

    Cu:2.5

    150/300

    Pistons, extrusion molds, pump blades, extrusion screws

    Ni60AACuMo2

    60

    0.8

    16

    4.1


    5.00Max

    1

    Bal



    3.2

    Cu:1.5

    150/300

    Pistons, extrusion molds, pump blades, extrusion screws

    Ni60AACuMo3

    57

    0.6

    16.5

    4


    5.00Max

    2

    Bal



    3

    Cu:2.0

    150/300

    Pistons, extrusion molds, pump blades, extrusion screws

    Ni60ACuMo

    60

    0.8

    15.5

    4


    15.0Max

    1

    Bal



    3.5

    Cu:1.0

    150/300

    Pistons, extrusion molds, pump blades, extrusion screws

    Ni60W

    62

    0.8

    16

    4

    3.5

    15.0Max


    Bal



    3.3


    150/300

    Pistons, pump blades

    Ni60CuMoW

    60

    0.6

    16

    4

    2.5

    4

    2

    Bal



    4

    Cu:2.0

    300/500

    Pistons, pump blades, ball valves

    Ni60M

    63

    0.8

    16.5

    4.3


    15.0Max


    Bal


    0.30Max

    3


    150/300

    Laminar roller


    Global Fusion Spray welding powder can be sued for Pistons, extrusion molds, pump blades, extrusion screws, ball valves, Laminar roller.

    image001(001).jpg

    Slide Rails

    image003(001).jpg

    Gear teeth

    image005(001).jpg

    Screw conveyors

    image007(001).jpg

    Forging mold

    image009(001).jpg

    Pump Blades

    image011(001).jpg

    Extrusion screws

    image013(001).jpg

    Ball valves

    image015(001).jpg

    Laminar roller

    Applications Process:

     

    3D Print

    25 3D Print.png

    PTA Overlaying

    26 PTA Overlaying.png

    Hot Isostatic Processing

    27 Hot Isostatic Processing.jpg

    Metal Injection Molding(MIM)


    28 Metal Injection Molding(MIM).png

    29.jpg


    Induction Overlaying

    30 Induction Overlaying.png

    OXY Acetylene Spraying

    31 OXY Acetylene Spraying.png

    Laser Cladding

    32 Laser Cladding.png

    High Velocity Oxygen Fuel Spraying(HVOF or HVAF)

    33 High Velocity Oxygen Fuel Spraying.png

     

    Partners of Global Fusion:

    BeiHang University, Tsinghua Univesity, Xi’An JiaoTong University, Harbin Institute of Technology, University of Science and Technology Beijing, Beijin Institute of Technology, Shanghai Jiao Tong University, Fudan University, Tianjin Polytechnic University, Tianjin University, Tianjin University of Technology, Hebei University of Technology, The Academy of Armored Forces Engineering, 703 Research Institute, 625 Research Institute, AECC Shenyang Liming Aero- Engine Co., Ltd.? Guangzhou Research Institute of Non-ferrous Metals ? General Research Institute for Nonferrous Metals, etc.

    Construction of Laboratory

    Chemical Analysis Laboratory

    Metallographic laboratory

    Thermal Spray Process Room

    Powder Physical Performance Testing Room

    34.jpg

    Four No-Passing Principles for Unqualified Products

    No-Passing of Unclear Reasons

    No-Passing of Vague Responsibilities

    No-Passing of Unimplemented Education and Treatment

    No-Passing of Unimplemented Corrective and Preventive Action

    35.png

    About Delivery and shipping                                 

    1. For the products which we have raw material in stock.               

    We can deliver the products within 7-10 days after the payment has been confirmed. 

    We will choose the shipping way as you required: By sea, by air, by express, etc. 

    As for the costs and shipping period information, please contact us via telephone, mail or online trade manager. 

    2.For the products need to start from smelting                

    We will finish the production within 20-25 days after the deposit has been confirmed. We will choose the shipping way as you required:  By sea, by air, by express, etc. 

    As for the costs and shipping period information, please contact us via telephone, mail or online trade manager.

     

    Contact Us
    Contact: Eric Gao
    Mob: +8618917975006
    Email: gaoyl@zhuyualloy.com
    Website: www.alloyconsumables.com


Send your message to this supplier
To:  

Shanghai Global Fusion Materials Technology Co.Ltd

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  

  
You May Like
Not exactly what you want? One request, multiple quotations Get Quotations Now >>
Related Searches :